Etihad Rail completes European signalling and safety tests on eastern route
Tests covered the European Train Control System Level 2, paving the way to connect ports and industrial and commercial zones through freight and container services.

Etihad Rail, the developer and operator of the UAE’s national railway network, announced on Thursday, November 12, 2026, that it had successfully completed all technical and operational tests of the European Train Control System (ETCS Level 2) along the eastern route linking the emirates with the country’s main ports and logistics hubs.
Highest standards of digital safety and train tracking
The advanced European signalling system enables the real-time monitoring of freight and passenger trains through satellites and secure wireless communication networks. It supports automatic speed control, prevents human error and increases rail capacity while maintaining the highest levels of accuracy and operational safety.
Linking seaports with industrial and commercial zones
The company said the completion of the tests paves the way for the full and integrated operation of freight and container services between Khalifa Port, Jebel Ali Port and Fujairah Port, as well as manufacturing areas in Al Ruwais, Sharjah and Ras Al Khaimah. The services are expected to cut road transport times by up to 40 per cent and reduce logistics costs for companies.
Supporting sustainability and cutting carbon emissions
The integrated operation of the Etihad Rail network will take thousands of heavy trucks off the UAE’s highways each day, reducing carbon emissions from the country’s road transport sector by more than 21 per cent annually and reinforcing the UAE’s position as a global logistics hub connecting regional and international markets.

